Larry just sent me an email with all this
The 2015 Pinnacles Climber Appreciation Days are ON! Mark your calendars - Oct 23-25th - and tell your friends.
As you may have heard, James Bouknight has stepped up to a new position - at Joshua Tree National Park and we will miss him. We are in contact and he is "behind us 100%". We will be in quite capable hands with a new Pinnacles N.P. liaison - Mathias Spero who you may have met last year and is gung-ho to help out. We welcome his involvement. Like previous years John Dunham from the Trail Shop will supply us with tools and materials with support from Mike (who's temporarily filling James place).
Slightly new format this year: Friday will be a full project day as will Saturday and presents opportunity for those who may have family obligations on the weekend. We want to get a lot done Fri-Sat so we can climb on Sunday. Sat evening will be the BBQ & Gearapalooza; Sunday we are all free to paw the rock with many new and old friends! In particular we want to encourage folks to "work" both days so we have continuity and can complete projects. More detailed information (registration, camping, raffle and auction) will be forthcoming in the next two weeks.
My real reason in reaching out to y'all (this is Jamie talking thru me) - is to gain your advice and input for sites needing attention and you ideas about projects. If you would take a moment to review this list and let myself and Mathias (Mack) know your thoughts and suggested priorities it would be a big help. Please respond this week, so he and I can talk next week, formulate a plan, source materials and permissions and make it happen!
Here are some of the opportunities:
Follow Up
Pipsqueak - tune-up team to survey work from '14 and make any repairs
Discovery Wall - base of Swallow Crack #74 - possible 2-3 check steps* volunteer plaques
Upper Crust - maintain blocks and brushing from '14; tune up staging areas #210-211 (rail fence?)
Extensions
Tourist Trap - tune up team; possible extension of trail up and right (terraces & steps); volunteer plaques
Upper Crust - continue log steps in upper chimney; block old trail to summit & recover retaining lumber;
CCC Road - W of Reservoir, tune up last years work and push towards W side VC?
New Work
Unmentionable - define preferred path, build couple of steps, brush / block unnecessary paths
Teaching Rock - Rx of base, mitigate erosion (tree roots), water bars, steps & staging areas (this is a big project and needs detail & permissions)
Future Projects (we could assign scouts to plan and make topo w/ notes)
Hand / Snail / Frog access - Deserted Valley we looked at this... should a trail be aligned out of the creek bed (to the E)? Mud n'Crud connector?
Yaks Access - which is preferred? what to do with open slope S of Monolith?
Reservoir N Side - Is their a logical path route - out past The Watchman - to the CCC Rd?
West Side (future - possibly survey and do this over several "Fridays")
Alias Bandits to Corona (and beyond) - needs retaining, steps, definition of staging areas; big project that needs detailed plan, possibly rock work. ideas? .
Flumes Wall - what is needed from Tilting Terrace down and left (again future)
Upper Flumes - new area, does this need a path or brushing?
Clean Sweep trash pick up (annual projects)
- Reservoir perimeter hike
- Caves down & below Monolith; requires 3-4 pp rappelling / ascending teams
- Back Door area and below Rim Trail; requires 3-4 pp rappelling / ascending teams
- High Peaks / Hawkins Peak trails hike
- Old Pinnacles Trail to Juniper Canyon
* Stone work, usually done by seasonal contractors.