"I have just found that many pitches can be easily linked with 70m and a lot of raps can be done with a 70m. But, this is my preference because I don't like to stop for belays. I've been know to ask my partner to take out the belay device, break down the belay, and get going because I need another 20'."
Nice, that's the way to climb, unless it's on a slab....
I remember when having a 60m was a big deal. Me bro and I did S Crack in 4 pitches.
I like the logic that most pitches aren't 50m stretchers. I'd just have to be in shape to have enough gear for that extra 10m (I know, it's only 36ft or so).